Energy

/Energy

Hinkley Point C

, ,

This is the biggest project we have been involved with. EDF Energy is building the first new nuclear power station in the UK for a generation at Hinkley Point in Somerset working towards Britain’s low-carbon future. SSS are working with Fairport on this vital infrastructure project providing setting out and survey information for the construction of [...]

St Peters School, York ~ First Point Surveys

We were given a specification to undertake a Laser Scan survey of four areas of buildings at St Peters School. This was to be done in order to produce a point cloud, from which drawings of 1:100 scale would be produced. A 5mm point cloud resolution was required due to the detail of the building [...]

Eakring Pylon Survey ~ CARD Geotechnics

,

Eakring Substation is also used as a test centre for National Grid, and was to be the site to test a newly designed pylon structure by installing a 1km length of test route. As the site was under National Grid control and a working electric substation, the surveyor on-site had to be BESC trained, in [...]