Hinkley Point C

, ,

This is the biggest project we have been involved with. EDF Energy is building the first new nuclear power station in the UK for a generation at Hinkley Point in Somerset working towards Britain’s low-carbon future. SSS are working with Fairport on this vital infrastructure project providing setting out and survey information for the construction of [...]

Woodnook, Accrington ~ Place First

We were asked to perform a full topographical, elevational and internal survey of three streets of terraced houses including the back alleyways and yards in the Accrington area. There was a total of 88 properties that required survey works to be carried out for the proposed redevelopment. A full, closed traverse was preformed around the [...]

Eakring Pylon Survey ~ CARD Geotechnics

,

Eakring Substation is also used as a test centre for National Grid, and was to be the site to test a newly designed pylon structure by installing a 1km length of test route. As the site was under National Grid control and a working electric substation, the surveyor on-site had to be BESC trained, in [...]