Hinkley Point C

, ,

This is the biggest project we have been involved with. EDF Energy is building the first new nuclear power station in the UK for a generation at Hinkley Point in Somerset working towards Britain’s low-carbon [...]

St Peters School, York ~ First Point Surveys

We were given a specification to undertake a Laser Scan survey of four areas of buildings at St Peters School. This was to be done in order to produce a point cloud, from which drawings [...]

Woodnook, Accrington ~ Place First

We were asked to perform a full topographical, elevational and internal survey of three streets of terraced houses including the back alleyways and yards in the Accrington area. There was a total of 88 properties [...]

Eakring Pylon Survey ~ CARD Geotechnics

,

Eakring Substation is also used as a test centre for National Grid, and was to be the site to test a newly designed pylon structure by installing a 1km length of test route. As the [...]